Total field rebuild to include reshape, surveying new playing surface, irrigation, drainage, establishment and maintenance all within a 8 week window of the Summer school holiday.
PRELIMINARY WORKS
Prior to starting turning dirt onsite we had to engage and comply with all Safety Documentation, Safety signage, Survey of current fields/surrounding land and engage Temporary fencing to the perimeter.
Field Preparation works:
Glyphosate applications 2 at 7 days apart
Deep Ripping in numerous directions 500mm deep to break up the underlying sub grader
Blecavating in 3 alternative directions to turn soil into a fine tilt hand incorporate amendments
Shape sub grade surface to achieve best playing field possible while marrying in with surrounding hard surfaces and creek run offs
Swale drains had been modelled into the design and had been cut into the run off areas
Sub surface drains installed into toe of the swale drains to further help water movement
Irrigation system was installed to cover 100% of the 25,000 sqm turf area
Turf sand was Imported and levelled over the top with GPS machine-controlled equipment
Field was final trimmed
1Irrigation system was checked prior to turning
1Turf Starter fertiliser, bifenthrin residual insecticide and pre emergence was applied prior to turf install
1Turf installation 25,000 sqm was installed over 4 days, rolling cut in and tidy up throughout this process.
The establishment period started with a program of 6 weeks of, inspecting, top dressing, mowing, fertilsing, weed and pest control and adjusting irrigation to suit the turf and weather requirements.
After surveying the field and calculating the soil available and imported turf sand the above design was engaged. As over 7,000 m3 of soil had to be moved, 2 dozers with machine control had been engaged to rough in the surface to +/-25mm with final trimming done with a tractor and laser box blade.Soil being pushed aroundGenesis College selected Hanceys Turf Premium Wintergreen couch wall to wall for all the area to cover the cricket field, soccer fields and athletics areasAt time of field handover the turf was ready for play and the kids to return to school.12 months on and the field is being enjoyed by the kids